Get comparable quotes
Ask two or three builders to price the same drawings and the same specification. If each one prices their own idea of the job, you are comparing different things. The cheapest quote is often the one that has left something out, such as the steels, the skip, the plastering or the making good.
When you go through the quotes, ask each builder:
- What is included and what is not?
- Who runs the job day to day, and who do I call when something goes wrong?
- How long will it take, and when can you start?
- Which trades are your own people and which are subcontractors?
- Can I see a job you have finished, or speak to a recent customer?
Check the company and its insurance
If the builder trades as a limited company, look it up on Companies House. It is free. Check the company is active, its accounts and confirmation statement are up to date, and the directors match the people you are dealing with. A company only a few months old, or with overdue accounts, is worth a question.
Sole traders do not appear there, so ask for a trading address and look for a track record of local work. Either way, make sure you have a real address, not just a mobile number.
Then ask to see the insurance certificates, not just a yes.
- Public liability, which covers damage to your property or a neighbour's, and injury to the public.
- Contract works or all-risks cover, which protects the work itself, such as a half-built extension damaged in a storm or a fire.
- Employer's liability, which is a legal requirement for any builder with employees.
Tell your own home insurer about the work too. Some policies change while a house is a building site.
A fixed price with a specification
A good quote is a fixed price in writing with a line-by-line specification: what is being built, the materials, who supplies the kitchen or the tiles, and any provisional sums for things that cannot be priced until the work is opened up. A single figure on one line gives you nothing to hold the builder to.
Ask for a written programme too, showing the order of work and roughly how long each stage takes.
Staged payments and retention
Pay for work as it is done, against stages you can see: foundations in, walls up, roof on, first fix, plastered, complete. Never pay a large sum up front. A small deposit to order long-lead items such as windows, steels or a kitchen is normal, and the builder should be able to tell you what it is for.
Agree a small retention, often around 5%, held back until any snags are put right after completion. It gives both sides a clear end point.
A contract and written variations
Use a written contract. The JCT Homeowner contract is designed for this kind of work and sets out the price, the programme, payments and what happens if things change.
Changes happen on every job. Agree each one in writing, with the price and any effect on the programme, before the work is done. That way the final bill matches what you expected.
If you sign a contract at home rather than at the builder's premises, you normally have 14 days to cancel. The builder must tell you this in writing.
Red flags
- Cash only, or a discount for cash.
- No address, no company details and no paperwork.
- Pressure to decide quickly, or an offer to start next week because they happen to be in the area.
- A large deposit before any work is done.
- No written quote, no specification and no contract.
- Reluctance to show insurance certificates or past jobs.
- Telling you planning or building regulations are not needed without checking.
Next step
We give every customer a fixed price in writing after a site visit, with a line-by-line specification, a written programme and one point of contact for the whole job. Whoever you choose, use the checks above.