What it costs
Converting a single integral or attached garage into a finished room costs £13,000 to £24,000 plus VAT in Cheshire in 2026. That covers bricking up the door opening with a window, raising and insulating the floor, insulating the walls and ceiling, electrics, heating, plastering and decoration.
The lower end is a straightforward room such as a study or playroom. The upper end is a double garage, a room with a utility or shower room that needs drainage, new foundations under the infill wall, or a detached garage that needs more work to reach the standard of the house.
On top of the build you will usually pay for drawings and building control fees, and a lawful development certificate (£264) if you want written proof that planning was not needed.
Do you need planning permission
Usually not for an integral or attached garage. Turning it into a room is internal work, and replacing the garage door with a wall and window is normally covered by permitted development as long as the materials match the house. There are exceptions worth checking before you start.
- Estate conditions. Many newer estates were approved with conditions that remove permitted development rights or require the garage to be kept for parking. Check the original decision notice on the Cheshire West and Chester, Cheshire East or Warrington planning portal. If a condition applies, you need a householder application (£528).
- Conservation areas. Permitted development is narrower and some areas have an Article 4 direction that removes the right to alter the front of the house. Check with the council before changing the elevation.
- Listed buildings. Almost any alteration, inside or out, needs listed building consent.
- Detached garages. Using one as part of the house, such as a home office or gym, does not usually need permission. Using it as a separate home, or letting it out, usually does. An annexe someone lives in sits in between, so ask the council first.
If the conversion loses off-road parking, the council may look at that if an application is needed.
Building regulations
Every garage conversion into a habitable room needs building regulations approval. Building control will look at:
- Foundations under the new wall where the garage door was. The existing slab or threshold is not always good enough.
- Damp. A new damp-proof membrane, with the floor usually raised to match the house.
- Insulation to current standards in the walls, floor and ceiling.
- Ventilation, including an extractor in any wet room.
- Fire safety. A smoke alarm linked to the rest of the house, and an escape window if the room can only be reached through another room. If part of the garage stays as a garage, the wall and door between it and the house still need fire separation.
- Electrics, done by an electrician registered to self-certify under Part P, or inspected by building control.
- Drainage, if you add a sink, shower or WC.
Integral or detached
An integral garage is the simplest. It already shares walls with the house, the heating and electrics are close by, and the room connects straight into the hallway or kitchen.
A detached garage often has a single skin of brick, a thin slab and a basic roof, so it may need the walls lined or rebuilt, the roof replaced and new services run across the garden. Older prefabricated garages often have asbestos cement roof sheets, so have them tested before anyone cuts or removes them.
How long it takes
- Drawings: one to three weeks.
- Building regulations: a full plans application must be decided within five weeks, or two months if you agree an extension. A building notice lets work start sooner but gives you no approved plans up front.
- Planning or a lawful development certificate, if needed: allow around eight weeks.
- On site: usually three to five weeks for a single integral garage, longer for a detached one.
Next step
We look at the garage on a site visit, check the planning history and the condition of the floor and walls, then give a fixed price in writing with a line-by-line specification and a programme.